Work in Progress (WIP) on The Lower Falls of the Yellowstone River.
10"x14" on Arches 140lb. cold press
This is kind of further along than other wips that I have posted before, but once I started I didn't stop until this point. I worked wet in wet and dry in wet starting with the very furthest back trees, then worked forward and down the right hand side, then did the cliff face on the left.
It still has work to do, so tune back in later.
No comments:
Post a Comment